Hongmei transformer enclosure with a nameplate and front-panel indicators.
Hongmei transformer enclosure with its nameplate and front-panel indicators.

If you’re handling transformer sizing for motors and shared loads, run two separate checks. Total your simultaneous running kVA first, then verify motor-starting terminal voltage on its own. Separating those two checks helps you avoid stalling motors on startup or paying extra for unused capacity. Confirm that the dry-type transformer’s rated voltage, frequency, cooling, and enclosure thermal rating match your site.

  • Label every machine as motor shaft kW, electrical input kW, or kVA before adding loads together.
  • Walk through a reusable five-step calculation to turn simultaneous motor kW into running kVA.
  • Screen large direct-on-line motors for high startup current, then pull real locked-rotor figures from the motor datasheet.
  • Reconfirm the combined package rating whenever an enclosure is delivered separately or added on site.

Why Does Transformer Sizing Need Separate Running and Motor-Start Checks?

Transformer sizing requires separate continuous running and motor-starting checks because steady heat buildup and brief startup voltage drops behave differently. Running load is the continuous electrical power a dry-type transformer carries during normal shifts. Motor starting is the brief current surge a motor draws while accelerating from standstill. Both checks matter.

Picture a newly installed mine dewatering pump or workshop rock crusher. Once the motor reaches full speed, the dry-type transformer stays cool all shift. Yet when an operator presses start, lights dim and the breaker trips. Steady kVA totals alone leave that drop hidden.

What Do the Nameplate Rating and Startup Check Each Cover?

The rated-capacity field on our transformer nameplate anchors your continuous-load check. That rating shows what the windings carry continuously when site voltage, frequency, and cooling match. Startup creates a shorter, sharper electrical stress. It belongs on its own line of your sizing sheet.

A dry-type transformer’s electrical and magnetic characteristics affect a distribution system’s voltage regulation and efficiency. Separately, motor starting is one of the main causes of voltage dips. Passing the running check confirms your windings handle daily heat. Passing the startup check confirms your motor gets enough terminal voltage to accelerate smoothly.

Before totaling loads, confirm your site supply and machine voltages line up using our three-phase voltage and phase matching guide. If you’re still comparing dry-type builds, browse our Hongmei dry-type transformer range as well. Start your sizing sheet by listing every machine that runs at the same time.

Which Equipment Loads Count Toward Continuous Transformer Sizing?

Continuous transformer sizing starts with a simultaneous load list where every machine is marked as motor shaft kW, electrical input kW, or kVA. Simultaneous load is the combined electrical demand of all equipment operating during your busiest shift. Adding mixed power labels underestimates winding current. That creates overheating risk.

Imagine an imported workshop line where three-phase motors, electric heaters, lighting, and variable-frequency drives (VFDs) share one dry-type transformer. Winding current creates resistance heating inside the transformer. Under IEC 60076-11:2018, a dry-type transformer’s rated power applies to continuous loading at its stated rated voltage, rated frequency, and temperature-rise conditions.

Motor nameplates create the easiest mistake on procurement sheets. An induction motor nameplate states mechanical shaft output in kW, while the transformer supplies higher electrical input power to cover motor losses. Because kW (real working power) at the shaft is lower than electrical input, divide shaft kW by motor efficiency first.

Next, convert electrical input kW into kVA (apparent power, the total current-carrying load a transformer delivers). In sinusoidal AC circuits, power factor links average real power in kW to apparent power in kVA. That phase-angle relation is derived for sinusoidal waveforms and does not automatically extend to non-sinusoidal waveforms. For VFDs or rectifier loads, read the actual input kVA or input amps from the equipment datasheet. For step-by-step arithmetic, use our guides to convert kVA to kW using power factor and convert kVA to rated current.

Which Related Checks Stay Separate From Main Sizing?

Two related items belong on their own lines outside your main equipment total. Check 50 Hz versus 60 Hz supply frequency compatibility separately, since continuous ratings hold only at their rated frequency. Small control-circuit VA sizing for contactors and relays also stays separate from main motor-load sizing.

Add two columns to your plant equipment sheet before running any math. Mark each load’s power basis (motor shaft kW, electrical input kW, or kVA) in the first column. Flag which machines run together during peak shifts in the second. Adding those two columns exposes missing motor losses before you total kVA.

When we review custom dry-type transformer requirements, we ask for your power figure, input and output voltages, and any enclosure, dimension, or material needs. Marking each load’s power basis and peak-shift overlap prepares that power entry before you convert to kVA.

How Do You Calculate Running kVA and Compare Candidate Transformer Ratings?

Calculating continuous transformer sizing takes five steps: total shaft kW, divide by efficiency, divide by power factor, compare kVA, and verify thermal conditions. Dividing electrical input kW by power factor gives apparent power (the total kVA a transformer delivers). Walking through one example shows how to drop your own nameplate numbers into each step.

Consider an example three-motor group running together on one shift. Start with a 300 kW motor alongside 60 kW and 30 kW example motors, totaling 390 kW of shaft output. An example efficiency of 0.90 brings electrical input to about 433 kW. A balanced lagging power factor of 0.80 yields 541.67 kVA of simultaneous running demand. Replace each example figure with the real values from your own motor nameplates.

Worked Running-Load Calculation

Step Calculation What it gives you
Sum simultaneous shaft power 300 kW + 60 kW + 30 kW = 390 kW Total mechanical output of motors running together
Convert shaft kW to electrical input kW 390 kW / 0.90 = 433.33333333 kW Electrical real power needed to cover motor losses
Convert electrical kW to running kVA 433.33333333 kW / 0.80 = 541.67 kVA Simultaneous apparent power demand on the transformer
Divide by candidate transformer kVA 541.67 kVA / 630 kVA = 0.8598 Steady-state load ratio against a 630 kVA benchmark
Express ratio as a percentage 0.8598 × 100 = 85.98% Continuous loading share before startup and thermal checks

The fourth row compares that running total against the 630 kVA rating listed on the KY certificate for model KKSG-630/1.2(0.693). Here, KY is the Chinese mark for mine general-type electrical equipment. That certificate covers only model KKSG-630/1.2(0.693) at 1.2(0.693) kV with IP21 protection. It applies specifically to underground chambers, main roadways, and non-coal mining environments free from dripping water and dust ingress. If your project is a non-coal mine site, check our KKSG mining dry-type transformer product page for non-coal mining builds. Whatever rating you compare, your calculated running total fills in the power entry we ask for when reviewing your inquiry.

Capacity Conditions Comparison

An 85.98% steady load figure confirms thermal fit only when site conditions match. A transformer’s rated apparent power corresponds to rated voltage and rated current on the same winding side. Under IEC 60076-11:2018, a separately delivered or site-added enclosure requires thermal assessment to determine the combined package’s rated power.

Condition you have checked What you can decide What to do next
Running input known; starting data missing Only continuous load can be compared Obtain starting data and equipment voltage limit
Both operating cases checked at specified voltage, frequency, and cooling Compare the candidate using those exact conditions Confirm the ordered rating and configuration
Motor power stated only as shaft-output kW Electrical input is not established by that figure Obtain actual electrical input and power factor data
Enclosure added later without combined thermal rating Bare-transformer rating does not settle package capacity Confirm enclosure thermal assessment and assigned rating

Look closely at the bottom row if you buy an open-frame dry-type transformer and add a local cabinet on site. Reconfirming the complete package’s thermal rating avoids overheating once the doors close. After confirming running kVA and enclosure thermal limits, verify whether your heaviest motor can start cleanly.

KKSG-30KVA transformer enclosure with its blue rating plate
A transformer rating plate is a model reference for the capacity check.

How Much Current Does a Motor Draw on Startup, and How Do You Check Voltage Drop?

Direct-on-line starting for large motors usually creates a large inrush current, often 6 to 8 times normal operating current, according to U.S. DOE guidance. Direct-on-line starting means connecting a motor straight to full supply voltage. That surge can create voltage sags, especially when the motor is large relative to the distribution system’s capacity.

A voltage dip is a sudden, brief drop in terminal voltage while heavy current flows. At equipment terminals, a voltage dip can cause equipment malfunction. By contrast, soft-starters such as special motor controllers and most VFDs can usually limit starting current to 1.5 to 2 times rated operating current. Use the 6 to 8 times range to decide if you need a dedicated startup check. Base your final transformer rating on the motor manufacturer’s actual starting-current table.

Picture a heavy mine fan or workshop crusher starting direct-on-line while conveyors and lighting stay on the same dry-type transformer. During acceleration, high inrush current flows through the transformer’s internal winding impedance. An induction motor’s terminal current also depends on terminal voltage and total impedance, which changes with speed (slip) from standstill to full speed. Steady-state motor equations assume balanced operation at constant or slowly changing speed, so they do not model rapid starting transients. Passing a continuous running-load check does not guarantee a clean motor start.

Five Motor-Start Inputs to Pull Before Sizing

Pull five concrete details from your motor datasheet and site layout before comparing transformer ratings:

  • Starting current or locked-rotor kVA: the standstill current or locked-rotor kVA published by the motor supplier.
  • Starting method: whether the machine starts direct-on-line or uses a soft-starter, reduced-voltage starter, or VFD.
  • Load acceleration duty: whether the driven equipment starts unloaded or accelerates against heavy inertia.
  • Concurrent running loads: every other machine staying online on the same transformer while that motor starts.
  • Circuit impedances and minimum terminal voltage: supply, transformer, and cable impedances alongside the lowest voltage your motor and controls tolerate.

Pulling locked-rotor data and starting method early keeps you from ordering a unit that passes steady math yet sags during startup. Suppose a direct-on-line start pulls terminal voltage below your equipment limit while running kVA fits comfortably. Compare two practical choices: step up to a larger transformer kVA rating, or add a soft-starter or VFD to lower starting current.

List those motor-starting figures beside your running kVA when organizing the input voltage, output voltage, and power details we ask for. You can then review our three-phase dry-type transformers to match candidate ratings to your equipment. Keep the motor supplier’s starting-current sheet beside your running-load total as you compare options.

How Do You Lock In Transformer Sizing in Three Steps?

Locking in transformer sizing follows three steps: build your peak-shift running kVA first, check motor-starting voltage drop second, and confirm site supply, frequency, and cooling third. Working in this order catches sizing gaps before you compare ratings or add an enclosure.

Running kVA comes first because it sets your daily thermal baseline and rules out units that are clearly too small. Motor starting comes second because a large direct-on-line motor can flip your choice toward a higher kVA rating or a reduced-voltage starter even when steady load fits. Site conditions come third because a mismatched supply frequency, tight airflow, or a cabinet added after delivery can overturn a bare-transformer rating.

Your One-Page Sizing Checklist

Bring four items onto one page before comparing candidate dry-type transformer ratings:

  • Simultaneous running-load list: every machine running together during peak shifts, labeled as shaft kW, electrical kW, or kVA.
  • Heaviest motor startup data: starting current or locked-rotor kVA, starting method, and minimum allowable terminal voltage.
  • Electrical supply details: site input voltage, required machine output voltage, phase, and supply frequency.
  • Installation and build needs: open-frame or enclosed mounting, cooling conditions, dimensions, and material requirements.

If your equipment also needs electrical separation between supply and load, review our industrial isolation transformers. To compare our dry-type options side by side, browse our transformer product range. You can also visit our other transformer procurement guides for voltage matching and kVA conversion steps. Check every candidate rating against all four items on that sheet before locking in your final kVA.

References

  1. MIT 6.061 Chapter 10 Analytic Design Evaluation of Induction Machines — J. L. Kirtley Jr. (copyright 2003) — 2003
  2. Math H. J. Bollen — Voltage Recovery After Unbalanced and Balanced Voltage Dips in Three-Phase Systems — 2003-10
  3. U.S. DOE — Improving Motor and Drive System Performance: A Sourcebook for Industry — 2014-02
  4. IEC 60076-11:2018 — Power transformers — Part 11: Dry-type transformers
  5. OpenStax — University Physics Volume 2, Power in an AC Circuit
  6. Virginia Tech — Transformer Model: Steady-State Testing and Performance of Single-Phase Transformers